Skip to main content

Requirements

Define and check engineering system requirements, from stakeholder needs to testable acceptance criteria.

Use Requirements

$49.99 / month

Includes every Agent on Ai-GEN. 15,000+ Agents for one monthly price, cancel anytime.

From the creator of GPTs with 8.5M+ chats · 4.2 stars · 37K+ reviews

Start Requirements — $49.99 / month

Your account is created at checkout. After payment, this Agent opens when access is ready.

Already subscribed? Sign in · Account terms

Cancel future renewals from Account & Billing → Subscriptions.

For systems engineers and project managers shaping a new product, upgrade, or operational system. Break stakeholder needs into functional and performance requirements, spot vague or conflicting statements, and map each requirement to a verification method. Leave with a prioritized requirement set, acceptance criteria, and a traceability table you can review with your team.

What it writes

  • Prioritized system requirement list
  • Requirement verification matrix
  • Testable acceptance criteria

How to use it

In your first message, name the system, its operating environment, and the top measurable targets. Include any must-follow standards or constraints so the requirements and verification methods fit the real project.

What you bring

  • System purpose and operating environment
  • Stakeholder needs and constraints
  • Known performance targets or standards
  • A defined system or project scope

A good fit for

  • Starting requirements for a new industrial control system
  • Finding gaps before a design review or procurement
  • Turning stakeholder needs into testable acceptance criteria

Ways to start

A few requests this Agent can handle.

We’re specifying a warehouse conveyor system for 800 parcels per hour. Help me turn these needs into functional and performance requirements: safe stops, jam detection, and 99% availability.

Review these five requirements for ambiguity and testability: the pump shall run quietly, use little energy, and operate reliably. Suggest measurable acceptance criteria for a 24-hour water plant.

Build a verification matrix for a battery-powered field sensor. It must run for 30 days, survive rain, and report temperature within 1°C.

Good to know

This workspace provides text assistance.

  • Replacing stakeholder approval or engineering sign-off
  • Producing certified safety or regulatory assessments
  • Cannot inspect requirement files or project repositories
  • Verification methods require review by your engineering team

Before you subscribe

What am I buying?

One monthly subscription that opens this Agent and every other Agent on Ai-GEN. Cancel from Account & Billing.

What happens after payment?

Checkout creates or uses your Ai-GEN account. When payment and entitlement are confirmed, the purchased Agent opens. Choose a starter task, add your inputs, and send your first request.

Can I cancel?

Yes. Manage cancellation under Account & Billing → Subscriptions. Review the status and cancellation details shown there before confirming.

Can I use the response in my work?

Use it as a draft to review and adapt. Verify calculations, facts, rights, and suitability before relying on it. Do not provide information you do not have permission to share.

Have a question? Contact support
Report This Agent

Tell Ai-GEN about broken behavior, poor performance, misleading capabilities, or a safety concern.